Skip to content
ToeLogics
Module 4 of 7 · Production

Production. Your factory floor, finally on one screen.

Recipes per article, production plans that issue material with a shortage check, labour teams who record their output in dozens, and a labour cost report that knows piece-rate from hourly.

● ToeLogics · Category board · Joggers

Category board · Joggers

Aslam · Stitching

A-307 Black 6-9

5/8 Dz

A-307 Black 9-11

2/6 Dz
Record output

Bilal · Lasting

K-120 Navy 2-5

7/10 Dz
Record output

Kashif · Cutting

C-044 Brown 6-9

12/12 Dz

A-307 Grey 6-9

1/6 Dz
Record output

Everything Production ships with.

Bills of material

A recipe per article, colour and size: materials, labour, overheads and by-products, with cost per unit recomputed on demand.

Production plans

Issue material with a shortage table before anything moves, lock, cancel and record output — all from one plan.

Labour teams

Departments, processes, labour types and labourers configured once. Each person sees their own share of the work.

Category & Article boards

Work in hand per labourer, ready stock and drafts by category — or follow one article across every stage.

Output in Dozen

Record output in dozens; the confirmation names both figures before it posts to stock.

Labour cost report

Piece-rate and hourly, detailed or summary, with CSV and PDF export.

Who gets the most out of it.

01

Factory owners

Real cost per pair, from leather and sole to the last labour rate.

02

Production managers

See every plan, shortage and team on the boards, live.

03

Supervisors

Record output for a team in dozens from the floor.

Questions.

Yes. The labour cost report handles piece-rate and hourly pay, by labourer, detailed or summary.

Footwear ERP · Made in Lahore

See your shoe business inside ToeLogics.

Book a free demo. We’ll walk you through sales, stock by size and colour, production and the app — and send you a quote for your team.